Volume 33 (2024)
Volume 32 (2024)
Volume 31 (2022)
Volume 30 (2021)
Volume 29 (2020)
Volume 28 (2019)
Volume 27 (2019)
Volume 26 (2017)
Volume 25 (2016)
Volume 24 (2015)
Volume 23 (2014)
Volume 22 (2014)
Volume 21 (2012)
Volume 20 (2011)
Volume 19 (2011)
Volume 18 (2008)
Volume 13 (2006)
Volume 12 (2005)
Volume 11 (2004)
Volume 10 (2004)
Volume 9 (2002)
Volume 8 (1999)
Volume 7 (1998)
Volume 6 (1996)
Volume 5 (1995)
Volume 4 (1994)
Volume 3 (1993)
Volume 2 (1992)
Volume 1 (1991)
Aligning activity based costing system (ABC) with activity based management (ABM) to control and manage organizational resources (Case study: Shahed industrial factories of Shiraz)

ahmad rajabi

Volume 18, Issue 54 , August 2007, , Pages 55-76

Abstract
  In this research, combining of ABC and ABM is used to control and manage organizational resources in the Shahed industrial factories of Shiraz as a case study. For this made products of this factory, by using activity analysis way, activities and resources which participate in the making products, were ...  Read More